NR 632 Week 6 Assignment; Sustainability of the Planned Change Project Worksheet
-
$20.00
| Institution | Chamberlain |
| Contributor | Adrian Smith |
Instructions: Consider the resources and support that will be necessary to sustain the planned change project. Complete the column on the right as you consider sustainability:
| Instituition / Term | |
| Term | Summer |
| Institution | Chamberlain |
| Contributor | Adrian Smith |






































