- Question: The overall project is considered to be the first level of the WBS. All of the following methods can be used to organize the second level of the WBS EXCEPT:
- Question: If a problem occurs during project execution, the WBS is helpful in understanding exactly where and why the problem occurred.
- Question: A _______ is the approved project plan mainly consisting of scope, schedule, and cost that is not normally altered unless a formal change control request is approved for modifying these plans.
- Question: A WBS dictionary is a document that defines each of the terms used in the project scope statement.
- Question: The project scope is the work that must be performed to deliver a product, service or result with the required features and functions.
- Question: The Work Breakdown Structure (WBS) is a framework that will be used as a basis for further planning activities including all the following EXCEPT:
- Question: A _________ is a written request or formal proposal to propose changes to any project planning component such as a document, project deliverable, or baseline (scope, cost, and time).
- Question: Which of the information below would NOT typically be included in the WBS dictionary for a specific work package?
- Question: All of the following elements should be included in a project scope statement EXCEPT:
- Question: A "top-down" approach to creating a WBS is typically used when a project is unique and different from previous projects.